PREVIEW | ||
SOVE4.5 has three modules, and each relevant to cretain stage of network design development.
Each module provides the next level of details and optimization to the previous. It is possible to skip the Master Plan module if urban MP has already defined primary and secondary substations locations. |
![]() |
< Previous | - 3 - | Next > Home |